Mirage Resort, Alexandra Headlands

In 2013 we were approached by the Management at the Mirage Resort to discuss the excessive swimming pool heating running costs they had with the LPG heating system. We suggested removing the LPG system and installing a heat pump to heat the 3 pools. After convincing the Committee of the expected savings in running costs we were given the green light to move ahead and install the new heat pump for the pools (120 kW) and a heat pump to heat the spa (21 kW). After installation the Committee monitored the running costs for the next 12 Months and were pleasantly surprised with the massive savings that had been made.